Drayage.
aka material handling, show-site handling
The fee for moving your crates the last hundred metres, from the loading dock to your stand and back.
What it actually means
Drayage, also called material handling, is the charge for unloading your exhibition freight at the venue, delivering it to your stand, storing the empty crates during the show and returning everything to the dock afterwards. In the United States it is billed by weight.
It is a classic surprise for exhibitors who are new to American shows. The carrier that brings your freight to the building is paid separately; inside the venue, an official contractor has the exclusive right to move it, and charges per hundred pounds with minimum fees. Loose or badly packed freight, late deliveries and overtime hours all add surcharges.
In Europe and the Gulf the word is rarely used, but the work still exists. Official forwarders charge for forklift time, on-site handling and storage of empties, usually by volume or by the hour. Either way, the last hundred metres often cost more than you expect.
Where you'll hear it
The trucking was two thousand dollars. The drayage to get the same crates from the dock to the booth was more than that.
Translation: the handling inside the hall can cost as much as shipping across the country.
Also in the exhibitor service kit, where the rate tables and deadlines live; in advance-warehouse instructions, which let you ship early for a lower rate; and in every experienced exhibitor's list of things to budget properly.
The pop-culture version
You found a cheap flight. Then you add a suitcase, a second suitcase and a bag that is two kilos over the limit, and the luggage costs more than the seat.
Drayage is that fee, for crates. The ticket, your stand space, looked fine. The bags, your freight, are charged by weight, with penalties for odd shapes and late check-in.
Frequent flyers pack light and check in early. Frequent exhibitors ship lighter stands, consolidate into fewer crates and hit the advance-warehouse deadline.
The practical rule: ask for the material-handling rate sheet before you design the stand, and estimate the weight; lighter materials and one consolidated shipment can cut the bill sharply.
Say it like you mean it
“We redesigned the stand in fabric and aluminium, and sent one consolidated shipment to the advance warehouse.”
Weight and timing are the two levers you control, and this uses both.“Our freight forwarder's quote covers everything to the booth.”
Usually it covers delivery to the dock. The move inside the venue is billed by the show contractor.You will also hear "marshalling yard", the car park where trucks queue for a dock slot, and "empties", the crates stored during the show. Both come with their own rules and waiting times.
How the big US and European technology shows compare, and what they cost and return.
Decoded next
Decoded by the Kurums editorial team. Kurums Decoded translates the language of business for people who are new to it. Definitions are kept short on purpose; the serious version above goes deep. Nothing here is financial, legal or career advice.
Discover more from Kurums | Business Intelligence
Subscribe to get the latest posts sent to your email.