Procurement · Free tool
Supplier Scorecard Calculator
How is this supplier performing overall, given what matters most to you? This scorecard rates a supplier from 1 to 5 on quality, delivery, and price, then weights each factor by the importance you set. Procurement managers, operations leads, and quality teams use it for quarterly supplier reviews and to compare suppliers on the same scale.
- OutputA weighted score out of 5
- No sign-up
- Copy or print the result
- How it works ↓
Your entries stay in this browser. Use Fill example to see a finished page first.
What this procurement tool gives you
The output shows the weighted score out of 5 and a table of each factor's score and weight. Bring it to a supplier business review: the table makes clear which factor pulled the score down, so the conversation goes straight to what needs to improve.
What you enter
- Quality score, from 1 to 5
- Quality weight (any non-negative number, such as 50)
- Delivery score, from 1 to 5
- Delivery weight
- Price score, from 1 to 5 (a higher score means you judge the price more favorable)
- Price weight
Worked example
The tool's example scores quality 5 with weight 50, delivery 4 with weight 30, and price 3 with weight 20. The weighted sum is 5 × 50 + 4 × 30 + 3 × 20 = 250 + 120 + 60 = 430. Divided by total weight 100, the supplier scores 4.30 out of 5. Price is the weakest factor but carries the least weight.
How is a weighted supplier score calculated?
Weighted score = (quality × quality weight + delivery × delivery weight + price × price weight) ÷ (quality weight + delivery weight + price weight).
Weights do not have to add up to 100; the tool divides by their sum, so weights of 5, 3, and 2 give the same result as 50, 30, and 20. The score stays on the 1 to 5 scale. Weights cannot all be zero, and every score must be between 1 and 5.
Tips before you use the result
- Define what each score means before rating, for example delivery 5 = on time every order, 3 = occasional delays.
- Base delivery and quality scores on records such as on-time rate and defect counts, not memory.
- Remember that price is scored so higher is better; a cheap supplier should get a high price score, not a low one.
- Keep weights the same across suppliers in a category, or the scores cannot be compared.
Frequently asked questions
What should a supplier scorecard include?
Most scorecards cover quality, delivery, and cost, since those are the factors that hit operations and budgets directly. This tool uses exactly those three with weights you choose. Some companies add responsiveness, sustainability, or risk; you can score those separately and discuss them alongside the weighted result.
Do the weights need to add up to 100?
No. The tool divides the weighted sum by the total of the weights, so any positive set works. Weights of 50, 30, and 20 and weights of 5, 3, and 2 give identical scores. Using weights that add to 100 simply makes the relative importance easy to read.
What is a good supplier score out of 5?
That is for your team to set. Many buyers treat scores above 4 as strong, 3 to 4 as acceptable with an improvement plan, and below 3 as a supplier to replace or develop. What matters most is scoring consistently and tracking the trend from one review to the next.
Where are my supplier scores kept?
Your last scores and weights are saved in this browser on your device rather than in an online account, since the tool asks for no sign-up. For a record of each review, copy the output or print it before scoring the next supplier.
More Procurement tools
Procurement guides on Kurums
USTR Prepares Section 301 Tariffs on Excess Industrial Capacity, November 2026: Notes for Procurement
On November 24, 2026, reports indicated the U.S. Trade Representative is preparing to release findings from a Section 301 investigation into excess industrial capacity covering China, the EU and other partners, with new tariffs expected to be tailored by country and to honor existing trade-deal caps.
Logistics & Supply Chain Management: Competing as a Network, Not as a Single Buyer
A Kurums Book Taste review of Logistics & Supply Chain Management for procurement and operations leaders who need the supply base to deliver cost, speed and resilience at the same time.
EU-Indonesia Trade Deal Signed: 98.5% Tariff Cuts, a GSP Cliff and What Buyers Do Now
The EU and Indonesia signed their trade agreement on 21 November 2026, but no duty has changed yet. With Indonesia’s GSP preferences ending on 1 January 2027, buyers need a three-rate landed-cost plan.
LA-Long Beach Tentative Port Deal: Ratification Risk and Q1 2027 Freight Contracts
A tentative ILWU Local 26 deal averted a strike at LA-Long Beach. What is settled, what is not, and how buyers should set Q1 2027 freight terms.
FERC’s Large-Load Orders: What the Grid Operators’ November Filings Mean for Power Buyers
FERC’s large-load orders date from June, not November. This week’s grid operator filings set out the commitments, deposits and curtailment terms buyers will face.
FERC Orders Grid Operators to Reform Large-Load Rules, November 19, 2026: Notes for Procurement
On November 19, 2026, FERC issued show-cause orders requiring the six major regional grid operators to justify or reform their tariffs for connecting large loads such as data centers within 60 days. Procurement and energy teams should review power-procurement timelines and cost-allocation exposure.
Results depend on the figures you enter; check them against your own records before you rely on them. Last updated: October 2026 · Kurums editorial team.