Procurement · Free tool
Reorder Point Calculator
At what stock level should you place the next order? The reorder point is the inventory level that gives your supplier enough time to deliver before you run out. This calculator works it out from daily use, lead time in days, and the safety stock you want to hold. It suits small manufacturers, e-commerce operators, and anyone managing stock without an inventory system.
- OutputUnits to reorder at
- No sign-up
- Copy or print the result
- How it works ↓
Your entries stay in this browser. Use Fill example to see a finished page first.
What this procurement tool gives you
The output shows the reorder point, the demand expected during the lead time, and the safety stock, each in the unit you counted in. Put the reorder point on the shelf label or in your stock sheet so whoever checks inventory knows when to raise a purchase request.
What you enter
- Daily use: units consumed or sold per day
- Lead time: days from placing an order to receiving it
- Safety stock: extra units held as a buffer, in the same unit as daily use
Worked example
The tool's example uses 10 units of daily use, a 14-day lead time, and 20 units of safety stock. Lead-time demand is 10 × 14 = 140 units. The reorder point is 140 + 20 = 160 units. When stock on hand falls to 160, place the order; the 20-unit buffer covers a late delivery or a busier-than-usual fortnight.
How do you calculate a reorder point?
Lead-time demand = daily use × lead time in days.
Reorder point = lead-time demand + safety stock.
The result is in whatever unit you used for daily use, whether pieces, boxes, or kilograms. Values cannot be negative.
Tips before you use the result
- Use lead time from order to usable stock, including processing and receiving, not just the carrier's transit time.
- Recalculate when demand is seasonal; a reorder point set in a quiet month will run you short in a busy one.
- Count stock already on order toward your position, or you may reorder twice for the same gap.
- Increase safety stock for suppliers with unreliable lead times rather than padding the lead time itself.
Frequently asked questions
What is the reorder point formula?
Reorder point = daily usage × lead time in days + safety stock. The first part covers what you will use while waiting for the delivery. The safety stock covers the unexpected: higher demand or a late shipment. This calculator applies exactly that formula and shows both parts separately.
How much safety stock should I keep?
It depends on how much your daily use and your supplier's lead time vary, and how costly a stockout is. A simple approach is to hold enough to cover a few extra days of use, then adjust based on how often you run short. Statistical methods exist for high-volume items, but the tool itself uses whatever safety stock number you enter.
What is the difference between reorder point and reorder quantity?
The reorder point tells you when to order: the stock level that triggers a purchase. The reorder quantity tells you how much to order once you do. This tool calculates the first. For the quantity, consider supplier price breaks, storage space, and how long you want the order to last.
Is my inventory data stored online?
No. The three figures live in your browser's storage on your own device, and the tool works without any sign-up. Reopen it on the same browser and your last item's numbers are still there. For several items, copy each result before entering the next one.
More Procurement tools
Procurement guides on Kurums
USTR Prepares Section 301 Tariffs on Excess Industrial Capacity, November 2026: Notes for Procurement
On November 24, 2026, reports indicated the U.S. Trade Representative is preparing to release findings from a Section 301 investigation into excess industrial capacity covering China, the EU and other partners, with new tariffs expected to be tailored by country and to honor existing trade-deal caps.
Logistics & Supply Chain Management: Competing as a Network, Not as a Single Buyer
A Kurums Book Taste review of Logistics & Supply Chain Management for procurement and operations leaders who need the supply base to deliver cost, speed and resilience at the same time.
EU-Indonesia Trade Deal Signed: 98.5% Tariff Cuts, a GSP Cliff and What Buyers Do Now
The EU and Indonesia signed their trade agreement on 21 November 2026, but no duty has changed yet. With Indonesia’s GSP preferences ending on 1 January 2027, buyers need a three-rate landed-cost plan.
LA-Long Beach Tentative Port Deal: Ratification Risk and Q1 2027 Freight Contracts
A tentative ILWU Local 26 deal averted a strike at LA-Long Beach. What is settled, what is not, and how buyers should set Q1 2027 freight terms.
FERC’s Large-Load Orders: What the Grid Operators’ November Filings Mean for Power Buyers
FERC’s large-load orders date from June, not November. This week’s grid operator filings set out the commitments, deposits and curtailment terms buyers will face.
FERC Orders Grid Operators to Reform Large-Load Rules, November 19, 2026: Notes for Procurement
On November 19, 2026, FERC issued show-cause orders requiring the six major regional grid operators to justify or reform their tariffs for connecting large loads such as data centers within 60 days. Procurement and energy teams should review power-procurement timelines and cost-allocation exposure.
Results depend on the figures you enter; check them against your own records before you rely on them. Last updated: October 2026 · Kurums editorial team.